Infrastructure

INFRASTRUCTURE
 
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
:30 acres
 
:Yes
 
 
:Yes, Permanent building & Temporary site also same place.
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
: Completed
 
 
Yes
iii
Permanent buildings constructed
 
 
:  CPWD pattern
iv
School building
 
 
 
: Complete
v
Dormitories
:  Boys 2.5 Nos.
   with Warden Residence 06 Nos.
 
 
 
:  Girls  1.5 Nos.
   with Warden Residence 04 Nos.
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete, Area 757 Sqm.
 
 
vii
Principal Residence
 
 
: Yes
viii
Staff Quarters
 
 
 
 
: Type III = 26 Nos.
  Type II = 06 Nos.
  Type  I  = 06 Nos.
  SP Sheds converted into Staff Qrs.:_____ Nos.
ix
M.P. Hall
 
:  not available
x
Workshop
 
:  not available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Shaft type / Column based
 
: 01 lacs litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
Yes
: 01 lacs litres
 
: Working satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: Cummins make
: 25 KVA
:  not working
: Year of procurement 2006
 
xiv
Sewage Pump
 
: No.
xv
Water Pump
 
 
: 5 HP capacity
 
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :  Rural  Feeder
:  Complete/ Incomplete
: 107 Nos. of Poles
 
: 18 hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
No Play Ground is existing.
 
: Not available
:  _______Nos.   – Available / not available
:  _______Nos.   – Available / not available
 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Potable,  02 Nos.-  working
: Potable, No. 
:  ______ hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:  Not available
xx
Fire fighting arrangement
 
:  Working
xxi
Last date of cleaning of
(a)   Septic tank
(b)   Water tanks
 
:
: 18/5/2008.
xxii
Whether area around transformer is fenced
:  Yes  /  No
xxiii
Whether open wells, if any, are covered from top
:   Yes
xxiv
Works taken up under M&R fund during current year and last year:-
 
 
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2007